Most rework in development originates at the requirements stage. What is heard stays abstract when it becomes a specification, and interpretations diverge once building begins. Meaning drifts with each handover, and after completion people say, "This is not what we had in mind."
From questionnaires, materials, and on-site interviews, we document how the work is actually done and the criteria for judgment. Forms and documents are organized by type and broken down into input, judgment, and output stages, to a level of detail that the engineers who build the system can design from directly.
The engineer who wrote the requirements designs and implements the system. Misunderstandings caused by passing specifications back and forth do not arise by structure. In the staffing assessment for specialized professionals, this approach took the project from finalized requirements to operation on site in 1 month.